Issue drill-down

Build / Allocation Backlog

The detail page shows the exact records that need action, the context around the delay, and the recommended next step for each item.

Recommended next action

Confirm inventory allocation and pull forward production slot

Build / Allocation Backlog

There are 2 build / allocation backlog items representing $2,798 in value at risk. The highest concentration is in Dunedin. Operations / Manufacturing should confirm inventory allocation and pull forward production slot.

Issue type

Build / Allocation Backlog

Owner team

Operations / Manufacturing

Number of records

2

Total value at risk

$2,798

Oldest unresolved item

41 days

Top affected city

Dunedin

Detail filters

Filter by operating dimensions to isolate the exact records that need attention.

Reset

Exact records needing action

Each row keeps the operational context next to the recommended next step.

Lead IDCustomerCityCountrySales repProductQuote valuePayment dateShip dateScheduled dateTechnicianDays waitingSeverityRecommended action
EVX-1022Otago Fleet ServicesDunedinNZAva ChenEvnex X22$1,6992025-02-22Not shippedNot scheduledUnassigned41 daysCriticalConfirm inventory allocation and pull forward production slot
EVX-1023Marlborough New BuildsBlenheimNZNoah PatelEvnex E2 Core$1,0992025-03-12Not shippedNot scheduledUnassigned19 daysHighCheck if an allocated unit can be reassigned from lower priority stock